Skip to content

News

News & Market Insights

Updates, analysis, and practical insights on business, investment, and living in Paraguay.

From call to e-bid in Paraguay: 15 days minimum, 50 MB per file

In Paraguay public tenders are found, read and answered through the Sistema de Información de las Contrataciones Públicas (SICP) of the public procurement authority, the Dirección Nacional de Contrataciones Públicas (DNCP). This guide follows a tender from publication to the opening of bids; the general rules are in the guide on Law 7021 and the G. 585 million threshold.

1. Find the call

  • One source. The SICP is the official channel: the tender documents (pliego de bases y condiciones) are free and valid only if obtained from the SICP (Law 7021/2022, Art. 104). Publication in newspapers is not required (DNCP Resolution 230/2025, Art. 39).
  • The search engine. The tender search engine filters by number, name, category, procedure type, public body and status; advanced search isolates tenders with electronic bidding. For a tender «En Convocatoria (Abierta)», the «Suscribirme a esta Licitación» button sends updates.
  • The market overview. The partners.com page on public tenders in Paraguay lists the open calls with their closing dates every day, from DNCP open data.

2. How much time there is

Between publication and the opening of bids there must be at least, in calendar days from the day after publication (Resolution 230/2025, Art. 39):

  • national Licitación Pública: 15 days; international: 30;
  • national Licitación de Menor Cuantía: 9 days; international: 15.

3. Ask questions

  • Through the SICP. Questions (consultas) are sent through the system; the public body cannot open bids before answering all those received on time, and the answers do not change the tender documents: changes require adendas, formal amendments (Law 7021, Art. 49).
  • Deadline to ask: up to the fourth working day before the opening in a Licitación Pública, the third in a Menor Cuantía (Resolution 230/2025, Art. 50).
  • Deadline to answer: the public body answers by the third working day before the opening in a Licitación Pública, the second in a Menor Cuantía (Art. 51).
  • Meetings and visits. The tender may provide for clarification meetings and technical site visits (Law 7021, Art. 49).

4. Prepare the electronic bid

Electronic bidding is compulsory when the tender or the DNCP requires it. The rules are in DNCP Resolution 232/2025 and in the DNCP guide for suppliers:

  • Who uploads. The supplier's administrator user in the register, or an authorised secondary user, with a security PIN.
  • Files. Attachments in pdf, zip or rar format, up to 50 MB each.
  • Register documents. Documents already uploaded to the register are linked to the bid; the supplier profile certificate is not accepted in the module.
  • Confidentiality. A document can be declared confidential only by citing the rule that allows it (Law 5282/2014 on access to public information); an unfounded declaration can be penalised.
  • Signature. User name and password count as a signature under Law 6822/2021.
  • Withdrawal and changes. Possible until the opening time.

A bid submitted in the wrong place or after the deadline is treated as not submitted (Law 7021, Art. 50). The tender may ask for a single envelope or two, a technical one with the bidder's documents and a financial one with the guarantee (Decree 2264/2024, Art. 69).

5. The opening

The opening is public, takes place within 30 minutes of the submission deadline and is recorded in minutes (Law 7021, Art. 50; Decree 2264/2024, Art. 70). Tender documents distinguish substantive documents, whose absence cannot be cured, from formal ones, which can be supplied later: the DNCP gives examples on its Información útil page.

The reverse auction

In a Subasta a la Baja Electrónica, the reverse electronic auction, an active register user is required; the bidding phase lasts up to 60 minutes, followed by a random phase of 3 to 10 minutes, and the lowest price wins. If the second bidder is a small or medium-sized business with a price up to 10% above the first, and the first is not one or is in a larger size category, it can make one last bid (Resolution 230/2025, Art. 118).

Sources

Ask our team

A few lines are enough. Our team in Asunción reads every request and replies in your language.

Phone (Optional)

Country code: type the number (with or without +) or the country name, then pick it from the list.

Digits only, without the country code.

If someone from the Partners.com S.A. Introducer Program referred you, enter their 6-character code.

Read More

· By

Public Tenders

Challenging a Paraguay tender result: 7 working days to protest

In Paraguay, a bidder in a public tender can file a protest with the DNCP against the tender documents, up to the third working day before the opening, or against the result, within 7 working days of notification. An admitted protest suspends the procedure and the DNCP decides within 35 working days.

· By

Public Tenders

Paraguay tenders: 5% bid guarantee, contract signed within 15 days

Bidders for Paraguayan public contracts guarantee 5% of their bid; the winner signs within 15 working days and guarantees 5% to 10% of the contract. Advance payments reach 30%, and if the public body pays more than 60 days late the supplier can ask to suspend the work. The rules from award to payment.