·
Flying into Asunción: API/PNR checks go on trial from November 2026

Immigration control at Silvio Pettirossi International Airport, Paraguay's main airport, is about to change. On 13 October 2026 the Dirección Nacional de Migraciones (DNM), the national immigration authority, announced that it had begun training the inspectors who will run the new system for recording arrivals and departures, due to start operating «en modalidad de prueba» (on a trial basis) in November. On 16 October the DNM confirmed that the pilot phase of the API/PNR system is planned from the same month.
What changes at the immigration desk
API (Advance Passenger Information) and PNR (Passenger Name Record) are the traveller's personal and booking data. According to the DNM, the system will allow them to be received and processed before the traveller arrives in the country. It is the first time Paraguay has used this tool. Airlines operating in the country were notified of its future application at the airport facilitation committee in March 2026.
The project, run by the DNM with the civil aviation authority, the Dirección Nacional de Aeronáutica Civil (DINAC), has five components. Those named in the 13 October statement include the BCS (Border Control System), which works alongside the API/PNR platform, electronic immigration gates (e-gates) and self-service kiosks where eligible passengers enrol in advance.
E-gates, starting with Paraguayans
A statement of 16 September describes the e-gates as intended for «ciudadanos nacionales y de la región» (nationals and citizens of the region). In the first phase they will handle the entry and exit of Paraguayan citizens through biometric identification, without going through the traditional desks, after enrolment at kiosks being installed at the airport or through a mobile app. The statements give no start date for the e-gates and no conditions for foreign nationals.
A timetable that has already slipped
The project rests on three 2025 decrees: No. 4183/2025 declares it of national interest and priority, No. 4991/2025 authorises procurement by exception under Ley No. 7021/2022, the public procurement law, and No. 4989/2025 secures its funding. In its statement of 18 December 2025 the DNM expected the system to be operating by mid-2026. By July 2026 and again in September the target had moved to the end of the year; in October the DNM refers to a pilot phase from November.
US agreements and digital travel documents
On 19 October Paraguay and the United States signed two instruments on air and border security. Under the Memorándum de Intención on border security, the United States will provide PISCES, a system for immigration checks and for monitoring passenger movements, together with training. The statement sets no date for installing PISCES.
Digital travel documents are still under study. On 15 October the Red Iberoamericana de Autoridades Migratorias (RIAM), the Ibero-American network of immigration authorities currently chaired by Paraguay, held an extraordinary meeting on ICAO Digital Travel Credentials. The subject returns at the 16th RIAM Congress in Asunción on 3 and 4 November, with immigration authorities from 21 countries. No adoption date has been announced.
Arriving by river
For travellers entering by river from Argentina or Brazil, the DNM temporarily closed 10 river posts on 12 October, rising to 14 on 13 October out of 19 in service, in the departments of Alto Paraná, Ñeembucú, Itapúa and Misiones: ferry (balsa) and launch services are suspended and, at the crossings concerned, the Argentine side has stopped operating. Every river crossing in Itapúa is closed; the Ayolas–Ituzaingó crossing over the Yacyretá dam was closed from 12 to 17 October by order of the Entidad Binacional Yacyretá, with reopening subject to an assessment. The closures apply «hasta nuevo aviso» (until further notice), and up to 22 October the DNM had published no reopening. The flood itself is covered in our article on the Paraná and river logistics.
What it means for those doing business in Paraguay
- No new formality announced for travellers. The DNM statements mention no forms or registration for people arriving by air: the API/PNR data are being worked out with the airlines.
- November is a trial. The DNM speaks of a pilot phase and of «modalidad de prueba»; no date for full operation has been given, and the timetable has already moved from mid-2026 to the end of the year.
- E-gates start with Paraguayan citizens. For foreign nationals, including those relocating to the country, no dates or conditions have been published yet.
- By river, check before you set off. With 14 posts closed until further notice, anyone planning to enter across the Paraná should confirm on the DNM website that the border post is operating.
DINAC's tender for a new cargo terminal at the same airport was covered in an earlier article.
The partners.com page on Residency & Tax Planning is the starting point for those who, once they have landed, want to put their papers and stay in order.
Sources
- Dirección Nacional de Migraciones, training for the new control system at Silvio Pettirossi (13 October 2026)
- Dirección Nacional de Migraciones, API/PNR and coordination with Interpol and the Ministerio Público (16 October 2026)
- Dirección Nacional de Migraciones, RIAM extraordinary meeting on digital travel documents (16 October 2026)
- Dirección Nacional de Migraciones, Paraguay–United States air and border security agreements (19 October 2026)
- Dirección Nacional de Migraciones, closure of 10 river posts (12 October 2026)
- Dirección Nacional de Migraciones, closed river posts rise to 14 (13 October 2026)
- Dirección Nacional de Migraciones, API/PNR training and Decrees 4183/2025 and 4991/2025 (24 September 2026)
- Dirección Nacional de Migraciones, biometric e-gates and advance enrolment (16 September 2026)
- Dirección Nacional de Migraciones, API/PNR progress update (16 July 2026)
- Dirección Nacional de Migraciones, airport committee and notice to airlines (16 March 2026)
- Dirección Nacional de Migraciones, launch of the API/PNR plan and Decrees 4183, 4991 and 4989 of 2025 (18 December 2025)
Ask our team
A few lines are enough. Our team in Asunción reads every request and replies in your language.



